Our products: vertical turbine pump, vertical wet pit pump, vertical oil sump pump, vertical condensation pump, right Angle gearbox
date:2024/8/22 20:07:10 source: visits()
Transporting and Storage Of The vertical turbine pumps 1.1 The bare packing is adopted usually. According to related packing technical requirement, the pump should be fixed firmly on wood in box bottom to prevent it from reverse and damage. The rotor also should be fixed to prevent it damaging the bearing on transporting because of its bump. 1.5 The technical data alone seals into in the waterproof moisture-proof plastic bag, and then put it into packing case. 1.6 Hit and inversion is not allowed in transporting. 1.7 when the pump arrives the site, user should open the packing case to see if they are complete、 abrasive and damaged. In saving the pump, pay attention to rust and damage, the period of validity of oil-sealing is 12 months. it should be checked and coasted in 12 months. when use the pump after 6 months ex-work, the bearing should be cleaned. Attention Of The vertical turbine pumps : 1. Before using the pump, read carefully this installation manual and other manuals of relating equipment to this pump. We are responsible for our products only when you follow the operating rules to install, use and maintain. 2. The rotation is anti-clockwise viewed from the motor end. If the rotation direction is wrong, the damage will be made to the pump. 3. Fill packing and lubricating-oil, let cooling-water in and check the concentric degree before operating the pump. 4. The lubricating cool-water must be filled in the guide bearing for delivering waste-water, if the capacity and pressure is not enough it will influence the pump using life. Before operating the pump,It should takes three minutes to pour water and can not close the cooling-water until the pump stop running completely. 5. It need not fill lubricating cool-water in the guide bearing for delivering clean water,But the protective tube must be removed. 6. Operating or increasing the pump speed without any liquid are not allowed. 7. The continuous running is not allowed with the discharge gate valve shut off,Otherwise it will make the pump vibration 、 the delivering liquid boil-off or the equipment damage . 8. The continuous running is not allowed when the capacity is 30% less than that of design capacity, unless add bypass pipe. 9. The continuous running is not allowed when the capacity is 120% more than that of design capacity otherwise it will bring NPSH and excessive power to motor. 10. Cut off the electricity before installing and repairing the pump, otherwise it will injury your body. 11. Don't touch the rotating parts outside or take the protecting cover off while the pump is running, otherwise it will injury your body. 12. During pump running, if there is abnormal noise and other troubles, stop it and check at once. 13. Our company follows the principle of "excellence". It has the right to carry out technical transformation without further notice. 14. If you have any doubts please call +86731854755888115. Overall installing drawing Attention: Please follow the overall installing drawing provided by our company technical center to make the foundation.
1.2 Release the water in pump before packing.
1.3
1.4
Add flange cover on inlet and outlet to prevent eyewinker entering the pump.
1.8
When open the packing case, if the pump needn’t to be installed for the moments, get rid of dirty oil and rust, and then coast the pump with grease.
1.9